Centrale La Trenche, Restauration de la centrale hydro-électrique
Route Billy-Diamond, Réhabilitation chaussée et remplacement de ponceaux
Aéroport Eastmain, Remplacement d’aides visuelles
Aéroport Régional de Val-d’Or, Réfection des chaussées et système électriques
Mine Lac Bloom, Travaux de décapage
Projet Côté Gold, TMF
-
Minier
Copper Cliff Complexe, Construction & Installation Services – M Area Buttressing
Project description
- Site preparation, clearing, and stripping
- Rock excavation and foundation preparation
- Aggregate production and management
- Loading, hauling, backfilling, and compaction of materials
- Installation of geomembranes and waterproofing systems
- Instrumentation and drainage network
- Water management
-
Minier
Copper Cliff Complexe, Parc à résidus – Renforcement des digues existantes
Description du projet
- Préparation de terrain, déboisement, décapage
- Excavation et préparation de la fondation sur le roc
- Production et gestion des agrégats
- Chargement, transport, remblai et compaction des matériaux
- Pose de géomembranes et système d’étanchéité
- Instrumentation et réseau de drainage
- Gestions des eaux
-
Béton,
Génie Civil
Arviat, Construction usine de fabrication
Description du projet
- Travaux de gestion pour la construction du bâtiment
- Fabrication et fourniture du béton pour les fondations et dalles structurales du bâtiment
- Installation de l’enveloppe et de la structure du bâtiment
- Contraintes climatiques et géographiques
- Mobilisation et démobilisation par voie maritime
-
Minier
Vale Copper Cliff Complexe, 5M Gallon Water Tank Site Preparation & Civil Works
Project description
- For the construction of a 5-million-gallon water reservoir, execution of civil works to connect to existing utilities and extend them to the mine shaft
- Storage area development
- Site preparation for the installation of reservoirs and other required infrastructure
- Granular road reconstruction
- Installation of pipelines
-
Béton,
Génie Civil
Arviat, Modular Homes Manufacturing and Training Facility
Project description
- Management work for the construction of the building
- Production and supply of concrete for the building’s foundations and structural slabs
- Installation of the building envelope and structure
- Climatic and geographical constraints
- Mobilization and demobilization by sea transport
-
Génie Civil
Centrale La Trenche, Restauration de la centrale hydro-électrique
Description du projet
- Construction des infrastructures temporaires
- Infrastructure du système de traitement des eaux usées
- Fourniture et installation du bâtiment de service
- Construction de la passerelle d’accès
-
Civil Engineering
La Trenche power station, Restoration of the hydroelectric power station
Project description
- Construction of temporary infrastructure
- Wastewater treatment system infrastructure
- Supply and installation of service building
- Construction of access footbridge
-
Génie Civil
Route Billy-Diamond, Réhabilitation chaussée et remplacement de ponceaux
Description du projet
- Effectuer le déboisement
- Concevoir et construire les ouvrages en gestion des eaux
- Concevoir et construire les ouvrages de maintien de la circulation
- Mettre en place de 36 nouveaux ponceaux circulaires en béton armé ou en tôle ondulée
- Infrastructure en vue de reconstruire la structure de chaussée
- Reprofiler les talus et fossés
-
Civil Engineering
Route Billy-Diamond, Pavement rehabilitation and culvert replacement
Project description
- Clearing the forest
- Designing and building water management structures
- Designing and building traffic maintenance structures
- Installing 36 new circular culverts in reinforced concrete or corrugated iron
- Infrastructure to rebuild the pavement structure
- Reprofiling embankments and ditches
-
Génie Civil
Aéroport Eastmain, Remplacement d’aides visuelles
Description du projet
- Ouvrages civils relatifs aux travaux électriques
- Travaux électriques pour la piste et le tablier
-
Civil Engineering
Eastmain Airport, Replacement of visual aids
Project description
- Civil works related to electrical works
- Electrical works for runway and deck
-
Génie Civil
Aéroport Régional de Val-d’Or, Réfection des chaussées et système électriques
Description du projet
- Travaux civils d’infrastructure
- Gestion et supervision des travaux tels que
- Mise en place d’enrobé bitumineux
- Reprise du marquage des chaussées
- Réfection complète du système électrique aéroportuaire
-
Civil Engineering
Val-d’Or Regional Airport, Pavement and electrical system rehabilitation
Project description
- Civil infrastructure works
- Management and supervision of works such as :
- Installation of bituminous asphalt
- Resurfacing of pavement markings
- Complete refurbishment of airport electrical system
-
Minier
Lac Bloom Mine, Stripping work
Project description
- Loading, transport and piling of overburden and mine backfill
- Water management
- Access preparation
- Drilling and blasting support
-
Minier
Mine Lac Bloom, Travaux de décapage
Description du projet
- Chargement, transport et mise en pile de mort terrain et remblai minier
- Gestion des eaux
- Préparation des accès
- Support aux travaux de forage et dynamitage
-
Minier
Éléonore Mine, Tailings Facility – Phase 5A Expansion
Project description :
- Phase 1 park closure
- Earthworks, clearing, stripping and piling
- Blasting and excavation
- Loading, transporting and placing backfill
- Laying geomembranes
- Crushing and screening
- Water management
- Drainage ditch and access ramp
-
Minier
Lithium Complex North America, Tailings Park
Project description
- Raising the dike
- Raising the emergency spillway
- Loading, transporting and placing backfill materials
- Road maintenance throughout the site
- Access road
-
Civil Engineering
Puvirnituq Airport, Reloading and stabilizing the movement area
Project description
- Granular surface preparation
- Pavement foundation
- Electrotechnical work
- Air traffic control and signalling
- Soil and materials management
- Coordination of supply and transport logistics
- Climatic and geographical constraints
-
Minier
Bloom Lake Mine, Snow clearing operations
Project description
- Snow removal for roads, buildings, infrastructure and parking lots
- Supervision and manpower, 24 hours a day, 7 days a week
- Specialized equipment for winter maintenance
-
Minier,
Civil Engineering
Lamaque Mine Complex, Tailings – North Basin
Project description
- Overburden stripping and transport
- Loading, transport and placement of riprap
- Construction of perimeter dikes and weirs
- Construction of access roads
- Installation of membranes
- Culvert installation
- Construction of runoff control structures
-
Minier
North American Lithium Complex, Mining operation
Project description
- 4-year contract for operation of the open pit
- Open pit mining
- Dewatering and keeping the pit dry
- Mass drilling and blasting in ore and waste rock
- Drilling and blasting of the final walls (pre-cutting)
- Loading and transporting of ore
- Loading and transporting of sterile
- Loading and transporting overburden and topsoil
- Dump maintenance
- Construction and maintenance of mining roads
-
Minier
Mont-Wright Mine, Stripping and mining works
Project description
- Loading, transporting and piling overburden
- Sterile loading, transporting and stacking
- Related works such as road maintenance, water management and stockpile maintenance
-
Minier
Canadian Malartic Mine, Canadian Malartic open-pit
Project description
- Overburden stripping works – 2 500 000 m³
- Loading and transporting waste rock and ore in the main pit – 60 000 000 mt
- Sound and dust management in a controlled environment
- Continuous operation 7 days a week, 24 hours a day
-
Minier
Vale Copper Cliff Complexe, Travaux civils et préparation du site
Description du projet
- En vue de la construction d’un réservoir de 5 millions de gallons d’eau, réalisation des travaux civils pour le raccordement aux services existants et prolongement de ceux-ci vers le puit de la mine
- Aménagement aire d’entreposage
- Préparation du terrain en vue des réservoirs et autres infrastructures requises
- Reconstruction d’une route granulaire
- Installation de conduites
-
Minier
Lamaque mine complex, Work on the tailings site
Project description
- Deforestation and clearing
- Raising of dikes phases 1 to 4
- Reprofiling and relocation of basins
- Development of runoff control structures
- Laying of membrane
- Transporting and laying of rockfill
- Installation of culverts
- Preparation of aggregates 0-300
-
Minier
Minier
Windfall project, Land preparation work
Project description
- Ongoing labor and equipment rental
- Excavation and transportation of overburden
- Management and construction of ore and waste rock piles
- Construction of site infrastructure to accommodate facilities
- Excavation and installation of underground pipes
- Snow removal and road and site maintenance
-
Minier
Minier
Wabouchi mine, Site preparation work
Project description
- Excavation and transport of spoil
- Drilling and blasting
- Backfill
- Aggregate crushing
- Culverts and related structures
- Membranes and geotextiles
- Catch basin
-
Minier
Greenstone Gold Mine, Tailing management facility
Project description
- Development of structures from the dam to the perimeter
- Development of the « TMF » inner dam structures and infiltration water collection dikes
- Perimeter seepage Collection ditches and seepage collection pond
- Transfer spillway channel
- Temporary diversion channel and emergency spillway
- Development and extraction of « Till » from borrow pit area
- General and perimeter access Road
- Drainage crossing
-
Minier,
Civil Engineering
Fire Lake Mine, Stripping work
Project description
- Loading, transporting and piling of overburden – 3 700 000 m³
- Related works such as road maintenance, water management and stockpile maintenance
-
Minier,
Civil Engineering
Hemlo Mine, Work on the tailings site
Project description
- Dykes, basins and surface water management at the mine
- Geotextile installation
- Transport and placement of rockfill
- Environmental basins
- Aggregate crushing
-
Minier
Alamos Gold – Island Gold Mine, Civil engineering – Phase 3 expansion project
Project description
- Installation of underground services on the mine site and connections to existing underground services
-
Agrégats
Mine Renard, Aggregate production
Project description
- Crushing and screening of waste rock for reuse in mine operations
- Abrasive for path and ramp maintenance
- Granular materials for the tailings facility
-
Civil Engineering
Windfall project, Power line – Civil works
Project description
- Civil works for a 69 kV power line connecting Windfall Mine to Hydro-Québec’s Lebel substation
- Deforestation and land clearing
- Path construction
- Portal backfill
- Aggregate screening
-
Civil Engineering,
Génie Civil
Waskaganish, New Rupert substation force main
Project description
- Replacing the sewage pressure line
- Supply and installation of a 250 mm diameter PVC DR 18 discharge pipe
- TerraBrute CR connecting the Rupert pumping station to the treatment basins – 2 600 m.lin.
- Supply and installation of drainage chamber
- Supply and installation of air vent chamber
- Project carried out in partnership with a local company
-
Civil Engineering,
Génie Civil
Waskaganish, Construction of the storm sewer outlet
Project description
- Deforestation work, topsoil stripping
- Complete road infrastructure and related works
- Construction of the rain outlet with a diameter of 1 200 mm – 945 m.lin.
- Ditch excavation and profiling – 1 900 m.lin.
- Related work including construction of culverts and manholes
- Project carried out in partnership with a local company
-
Civil Engineering,
Génie Civil
Waskaganish, Civil infrastructures rehabilitation
Project description
- Roadbed foundation reloading, insulation, and street reconstruction
- Adjustment and relocation of structures
- Paving, curbs, and sidewalks
- Landscaping and earthworks
- 40 service entrances
-
Minier
Projet Côté Gold, TMF
Description du projet
- Décapage et mise en pile des déblais
- Dynamitage et excavation
- Construction de digues
- Chargement, transport en mise en place des matériaux de remblais
- Construction de routes temporaires
- Construction de barrage et gestion des eaux
-
Minier,
Civil Engineering
Lamaque Mine – Triangle Worksite, Civil works
Project description
- Deforestation and excavation
- Earthworks and infrastructure for various buildings
- Construction work – Clean water line and sewer line
- Rehabilitation of the access road to the mine site
- Snow removal and maintenance of the site in winter
- Formwork and concrete placement
- Management of waste rock piles
-
Minier
Côté Gold project, TMF
Project description
- Stripping and piling of cuttings
- Blasting and excavation
- Construction of dykes
- Loading, transporting and placement of backfill materials
- Construction of temporary roads
- Dam construction and water management
-
Minier
Matawinie project, Land preparation
Project description
- Deforestation and stripping work
- Excavation, transportation and stockpiling of cuttings
- Drilling and blasting
- Mass earthmoving
- Development of access path and various infrastructure on site
- Shaping of a retention basin and ditch
-
Civil Engineering
Billy Diamond road, Replacement of complex culverts
Project description
- Complete demolition of the existing culvert battery
- Replacement of existing culverts for a new arched structure
- Replacement of existing culverts for a new concrete structure
- Earthworks, pavement foundation and miscellaneous works
- Maintenance of traffic during the work, including a temporary bridge
- Water management
-
Minier
Greenstone GoldMine, GoldField Creek diversion dyke
Project description
- Diversion dyke earthworks including the following works
- Diversion channel and temporary cofferdam
- GoldField Creek Permanent Diversion Channel
- Level 1 and 2 control structure
- Development and extraction of sand and gravel in borrow pits
- Various access roads
- Drainage crossings
-
Minier
Mont-Wright Mine, UTER-HS-2 water treatment plant
Project description
- Deforestation, grubbing, stripping and excavation work
- Development of ditches, shaping of protective embankments
- Backfilling and leveling work down to the finished ground
- Landscaping for factory and pumping stations
- Production, formwork and placement of concrete
- Process mechanics work
- Building mechanics for plumbing work
-
Civil Engineering
James Bay Road, Replacement of 22 culverts
Project description
- Replacement of 22 existing structures at 19 sites
- Supply and installation of 14 new culverts
- Repairs to 6 existing culverts
- Earthworks, pavement foundation and miscellaneous works
-
Minier
Matawinie project, Access road
Project description
- Stump removal and stripping – 25 ha
- Drilling and blasting
- Excavation and mass excavation
- Infrastructure works for the new access road to the future mining site
- Culverts and related structures – 36 units
- Crushing and aggregates – 170 000 mt
-
Minier
Odyssey Mine, Headframe excavation and hoist room
Project description
- Excavation and stripping of overburden – 142 000 m³
- Riprap on slopes with or without membranes – 25 000 m³
- Construction of access ramps and work areas – 10 000 m³
- Construction of access required for stripping work
- Surface water management
-
Minier
Mont-Wright Mine, Offload project
Project description
- Loading and transportation – 800 000 m³
-
Minier
Côté Gold project, Plant site
Project description
- General site earthworks down to finished ground level to accommodate new facilities and buildings
- Excavating and transporting overburden stockpiling
- Excavation and transporting topsoil stockpiling
- Drilling, blasting and rock excavation
- Site runoff and stormwater management
- Erosion and sedimentation control
- Construction of the mine water basin
- Construction and management of stockpiling yards
- Construction of the main access road and service roads
- Construction of roads, culverts, structures and ditches on site
- Supply and guarantee of quality control of granular materials
- Supply, installation and infrastructure works for all site services
- Design, supply and installation of various pumping stations and related works
- Supply, installation and infrastructure works for clean water supply to the site
- Supply, installation and commissioning of 13.8 kV overhead distribution lines
-
Civil Engineering
Chisasibi path, Replacement of culverts
Project description
- Intervene on existing structures on the Baie-James road
- Complete replacement of existing structures – 20 units
- Earthworks, pavement foundation and miscellaneous works
- Water management and road signs
-
Civil Engineering
Waskaganish, Industrial park
Project description
- Addition of sewer networks (storm, sanitary) and an aqueduct section in this sector of the community
-
Minier
Mont-Wright Mine, North Dyke
Project description
- Construction of the North Dike
- Deforestation – 4 ha
- Stripping, cleaning and treatment of rock – 80 000 m³
- Backfilling and riprap – 250 000 m³
- Membrane laying
- Extension of the internal ditch – 6 km
- Excavation and transportation of overburden – 200 000 m³
- Backfill for profiling and shaping – 7 000 m³
- Installation of culverts
- Path construction
-
Minier
Mont-Wright Mine, Basin C
Project description
- Development of a new mining runoff management network
- Deforestation and excavation of overburden – 250 000 m³
- Rock excavation including: drilling, blasting, excavation, transport – 30 000 m³
- Construction of dykes – 50 000 m³
- LLDPE Geomembrane – 80 000 m³
- Geodrain – 50 000 m³
- Geotextile – 50 000 m³
- Crushing and screening of aggregates – 100 000 m³
-
Minier
Barnat Mine, Stripping and backfilling
Project description
- Excavation, loading and transporting of material – 12 000 000 m³
- Loading, transporting and piling of rock fill – 1 000 000 m³
- Temporary noise barrier – 900 m²
- Construction of a storage area with a superficy of 3 275 m² – 2 000 mt
- Road maintenance service
- Operation of remote-controlled equipment for high-risk work (PC1250 excavator and D8 tractor)
- Sound and dust management in a controlled environment
-
Minier,
Civil Engineering
Lamaque mine complex – Sigma Worksite, Civil works
Project description
- Earthworks and infrastructure for various buildings
- Clean water line and sewer line
- Snow removal and maintenance of the site in winter
- Formwork and placement of concrete for the various service buildings
- Sealing and renovation works of 3 pumping stations
- Cyanide tailings line
-
Minier
Gouldie Mine, Mining operation
Project description
- Operation of an open pit in a « turnkey » formula
- Excavation, loading and transportation of ore and waste rock – 30 000 000 mt