La Trenche power station, Restoration of the hydroelectric power station
Route Billy-Diamond, Pavement rehabilitation and culvert replacement
Eastmain Airport, Replacement of visual aids
Val-d’Or Regional Airport, Pavement and electrical system rehabilitation
Lac Bloom Mine, Stripping work
Éléonore Mine, Tailings Facility – Phase 5A Expansion
Lithium Complex North America, Tailings Park
Puvirnituq Airport, Reloading and stabilizing the movement area
Bloom Lake Mine, Snow clearing operations
Lamaque Mine Complex, Tailings – North Basin
North American Lithium Complex, Mining operation
Mont-Wright Mine, Stripping and mining works
Canadian Malartic Mine, Canadian Malartic open-pit
Lamaque mine complex, Work on the tailings site
Côté Gold project, TMF
Windfall project, Land preparation work
Wabouchi mine, Site preparation work
Greenstone Gold Mine, Tailing management facility
Fire Lake Mine, Stripping work
Hemlo Mine, Work on the tailings site
Alamos Gold – Island Gold Mine, Civil engineering – Phase 3 expansion project
Mine Renard, Aggregate production
Windfall project, Power line – Civil works
Waskaganish, New Rupert substation force main
Waskaganish, Construction of the storm sewer outlet
Waskaganish, Civil infrastructures rehabilitation
Lamaque Mine – Triangle Worksite, Civil works
Matawinie project, Land preparation
Billy Diamond road, Replacement of complex culverts
Greenstone GoldMine, GoldField Creek diversion dyke
Mont-Wright Mine, UTER-HS-2 water treatment plant
James Bay Road, Replacement of 22 culverts
Matawinie project, Access road
Odyssey Mine, Headframe excavation and hoist room
Mont-Wright Mine, Offload project
Côté Gold project, Plant site
Chisasibi path, Replacement of culverts
Waskaganish, Industrial park
Mont-Wright Mine, North Dyke
Mont-Wright Mine, Basin C
Barnat Mine, Stripping and backfilling
Lamaque mine complex – Sigma Worksite, Civil works
Gouldie Mine, Mining operation
-
Minier
Copper Cliff Complexe, Construction & Installation Services – M Area Buttressing
Project description
- Site preparation, clearing, and stripping
- Rock excavation and foundation preparation
- Aggregate production and management
- Loading, hauling, backfilling, and compaction of materials
- Installation of geomembranes and waterproofing systems
- Instrumentation and drainage network
- Water management
-
Mining
Copper Cliff Complexe, Parc à résidus – Renforcement des digues existantes
Description du projet
- Préparation de terrain, déboisement, décapage
- Excavation et préparation de la fondation sur le roc
- Production et gestion des agrégats
- Chargement, transport, remblai et compaction des matériaux
- Pose de géomembranes et système d’étanchéité
- Instrumentation et réseau de drainage
- Gestions des eaux
-
Concrete,
Génie Civil
Arviat, Construction usine de fabrication
Description du projet
- Travaux de gestion pour la construction du bâtiment
- Fabrication et fourniture du béton pour les fondations et dalles structurales du bâtiment
- Installation de l’enveloppe et de la structure du bâtiment
- Contraintes climatiques et géographiques
- Mobilisation et démobilisation par voie maritime
-
Minier
Vale Copper Cliff Complexe, 5M Gallon Water Tank Site Preparation & Civil Works
Project description
- For the construction of a 5-million-gallon water reservoir, execution of civil works to connect to existing utilities and extend them to the mine shaft
- Storage area development
- Site preparation for the installation of reservoirs and other required infrastructure
- Granular road reconstruction
- Installation of pipelines
-
Béton,
Génie Civil
Arviat, Modular Homes Manufacturing and Training Facility
Project description
- Management work for the construction of the building
- Production and supply of concrete for the building’s foundations and structural slabs
- Installation of the building envelope and structure
- Climatic and geographical constraints
- Mobilization and demobilization by sea transport
-
Génie Civil
Centrale La Trenche, Restauration de la centrale hydro-électrique
Description du projet
- Construction des infrastructures temporaires
- Infrastructure du système de traitement des eaux usées
- Fourniture et installation du bâtiment de service
- Construction de la passerelle d’accès
-
Civil Engineering
La Trenche power station, Restoration of the hydroelectric power station
Project description
- Construction of temporary infrastructure
- Wastewater treatment system infrastructure
- Supply and installation of service building
- Construction of access footbridge
-
Génie Civil
Route Billy-Diamond, Réhabilitation chaussée et remplacement de ponceaux
Description du projet
- Effectuer le déboisement
- Concevoir et construire les ouvrages en gestion des eaux
- Concevoir et construire les ouvrages de maintien de la circulation
- Mettre en place de 36 nouveaux ponceaux circulaires en béton armé ou en tôle ondulée
- Infrastructure en vue de reconstruire la structure de chaussée
- Reprofiler les talus et fossés
-
Civil Engineering
Route Billy-Diamond, Pavement rehabilitation and culvert replacement
Project description
- Clearing the forest
- Designing and building water management structures
- Designing and building traffic maintenance structures
- Installing 36 new circular culverts in reinforced concrete or corrugated iron
- Infrastructure to rebuild the pavement structure
- Reprofiling embankments and ditches
-
Génie Civil
Aéroport Eastmain, Remplacement d’aides visuelles
Description du projet
- Ouvrages civils relatifs aux travaux électriques
- Travaux électriques pour la piste et le tablier
-
Génie Civil
Aéroport Régional de Val-d’Or, Réfection des chaussées et système électriques
Description du projet
- Travaux civils d’infrastructure
- Gestion et supervision des travaux tels que
- Mise en place d’enrobé bitumineux
- Reprise du marquage des chaussées
- Réfection complète du système électrique aéroportuaire
-
Civil Engineering
Eastmain Airport, Replacement of visual aids
Project description
- Civil works related to electrical works
- Electrical works for runway and deck
-
Mining
Mine Lac Bloom, Travaux de décapage
Description du projet
- Chargement, transport et mise en pile de mort terrain et remblai minier
- Gestion des eaux
- Préparation des accès
- Support aux travaux de forage et dynamitage
-
Civil Engineering
Val-d’Or Regional Airport, Pavement and electrical system rehabilitation
Project description
- Civil infrastructure works
- Management and supervision of works such as :
- Installation of bituminous asphalt
- Resurfacing of pavement markings
- Complete refurbishment of airport electrical system
-
Mining
Mine Éléonore, Parc à résidus – Expansion phase 5A
Description du projet
- Fermeture du parc phase 1
- Terrassement, déboisement, décapage et mise en pile des déblais
- Dynamitage et excavation
- Chargement, transport et mise en place des matériaux de remblais
- Pose de géomembranes
- Concassage et tamisage
- Gestion des eaux
- Fossé de drainage et rampe d’accès
-
Mining
Lac Bloom Mine, Stripping work
Project description
- Loading, transport and piling of overburden and mine backfill
- Water management
- Access preparation
- Drilling and blasting support
-
Mining
Éléonore Mine, Tailings Facility – Phase 5A Expansion
Project description :
- Phase 1 park closure
- Earthworks, clearing, stripping and piling
- Blasting and excavation
- Loading, transporting and placing backfill
- Laying geomembranes
- Crushing and screening
- Water management
- Drainage ditch and access ramp
-
Mining
Complexe Lithium Amérique du Nord, Parc à résidus
Description du projet
- Rehaussement digue
- Rehaussement du déversoir d’urgence
- Chargement, transport et mise en place des matériaux de remblais
- Entretien des chemins sur l’ensemble du chantier
- Chemin d’accès
-
Mining
Lithium Complex North America, Tailings Park
Project description
- Raising the dike
- Raising the emergency spillway
- Loading, transporting and placing backfill materials
- Road maintenance throughout the site
- Access road
-
Génie Civil
Aéroport Puvirnituq, Rechargement et stabilisation de l’aire de mouvement
Description du projet
- Préparation de la surface granulaire
- Fondation de chaussée
- Travaux électrotechniques
- Maintien de la circulation aérienne et signalisation
- Gestion des sols et matériaux
- Coordination logistique approvisionnement et transport
- Contraintes climatiques et géographiques
-
Civil Engineering
Puvirnituq Airport, Reloading and stabilizing the movement area
Project description
- Granular surface preparation
- Pavement foundation
- Electrotechnical work
- Air traffic control and signalling
- Soil and materials management
- Coordination of supply and transport logistics
- Climatic and geographical constraints
-
Mining
Mine Lac Bloom, Opérations de déneigement
Description du projet
- Travaux de déneigement pour les chemins, bâtiments, infrastructures et stationnements
- Supervision et main d’œuvre, 24/24, 7 jours/semaine
- Équipements spécialisés pour entretien hivernal
-
Mining,
Génie Civil
Complexe minier Lamaque, Parc à résidus – Bassin Nord
Description du projet
- Décapage du mort-terrain et transport
- Chargement, transport et mise en place d’enrochement
- Construction des digues périphériques et déversoirs
- Construction des chemins d’accès
- Installation des membranes
- Pose de ponceaux
- Aménagement des ouvrages de contrôle de ruissellement
-
Mining
Bloom Lake Mine, Snow clearing operations
Project description
- Snow removal for roads, buildings, infrastructure and parking lots
- Supervision and manpower, 24 hours a day, 7 days a week
- Specialized equipment for winter maintenance
-
Civil Engineering,
Mining
Lamaque Mine Complex, Tailings – North Basin
Project description
- Overburden stripping and transport
- Loading, transport and placement of riprap
- Construction of perimeter dikes and weirs
- Construction of access roads
- Installation of membranes
- Culvert installation
- Construction of runoff control structures
-
Mining
Complexe Lithium Amérique du Nord, Opération minière
Description du projet
- Contrat d’une durée de 4 ans pour exploitation de la fosse à ciel ouvert
- Exploitation minière de la fosse à ciel ouvert
- Dénoyage et maintien à sec de la fosse
- Forage et dynamitage de masse dans le minerai et le stérile
- Forage et dynamitage des murs finaux (prédécoupage)
- Chargement et transport du minerai
- Chargement et transport du stérile
- Chargement et transport du mort-terrain et terre végétale
- Entretien des Haldes
- Construction et entretien des routes minières
-
Mining
North American Lithium Complex, Mining operation
Project description
- 4-year contract for operation of the open pit
- Open pit mining
- Dewatering and keeping the pit dry
- Mass drilling and blasting in ore and waste rock
- Drilling and blasting of the final walls (pre-cutting)
- Loading and transporting of ore
- Loading and transporting of sterile
- Loading and transporting overburden and topsoil
- Dump maintenance
- Construction and maintenance of mining roads
-
Mining
Mine Mont-Wright, Travaux de décapage et exploitation minière
Description du projet :
- Chargement, transport et mise en pile de mort terrain
- Chargement, transport et mise en pile de stérile
- Travaux connexes tel que l’entretien des chemins, la gestion de l’eau et l’entretien des haldes
-
Mining
Mont-Wright Mine, Stripping and mining works
Project description
- Loading, transporting and piling overburden
- Sterile loading, transporting and stacking
- Related works such as road maintenance, water management and stockpile maintenance
-
Mining
Canadian Malartic Mine, Canadian Malartic open-pit
Project description
- Overburden stripping works – 2 500 000 m³
- Loading and transporting waste rock and ore in the main pit – 60 000 000 mt
- Sound and dust management in a controlled environment
- Continuous operation 7 days a week, 24 hours a day
-
Mining
Mine Canadian Malartic, Fosse Canadian Malartic
Description du projet
- Travaux de décapage du mort terrain – 2 500 000 m³
- Chargement et transport de stérile et minerai dans la fosse principale – 60 000 000 tm
- Gestion du son et des poussières dans un environnement contrôlé
- Opération en continu 7 jours sur 7, 24 heures sur 24
-
Mining
Vale Copper Cliff Complexe, Travaux civils et préparation du site
Description du projet
- En vue de la construction d’un réservoir de 5 millions de gallons d’eau, réalisation des travaux civils pour le raccordement aux services existants et prolongement de ceux-ci vers le puit de la mine
- Aménagement aire d’entreposage
- Préparation du terrain en vue des réservoirs et autres infrastructures requises
- Reconstruction d’une route granulaire
- Installation de conduites
-
Mining
Lamaque mine complex, Work on the tailings site
Project description
- Deforestation and clearing
- Raising of dikes phases 1 to 4
- Reprofiling and relocation of basins
- Development of runoff control structures
- Laying of membrane
- Transporting and laying of rockfill
- Installation of culverts
- Preparation of aggregates 0-300
-
Mining
Complexe minier Lamaque, Travaux parc à résidus
Description du projet
- Déboisement et défrichage
- Rehaussement des digues phases 1 à 4
- Reprofilage et relocalisation des bassins
- Aménagement des ouvrages de contrôle de ruissellement
- Pose de membrane
- Transport et mise en place d’enrochement
- Pose de ponceaux
- Préparation des agrégats 0-300
-
Mining
Projet Côté Gold, TMF
Description du projet
- Décapage et mise en pile des déblais
- Dynamitage et excavation
- Construction de digues
- Chargement, transport en mise en place des matériaux de remblais
- Construction de routes temporaires
- Construction de barrage et gestion des eaux
-
Mining
Côté Gold project, TMF
Project description
- Stripping and piling of cuttings
- Blasting and excavation
- Construction of dykes
- Loading, transporting and placement of backfill materials
- Construction of temporary roads
- Dam construction and water management
-
Mining
Projet Windfall, Travaux pour la préparation de terrain
Description du projet
- Projet réalisé par Asinii – Fournier
- Location de main-d’œuvre et d’équipement en continue
- Excavation et transport de mort-terrain
- Gestion et construction des haldes à minerais et stériles
- Construction des infrastructures du site en vue d’accueillir des installations
- Terrassement et installation de conduites sous-terraines
- Déneigement et entretien des chemins et du site
-
Mining,
Minier
Windfall project, Land preparation work
Project description
- Ongoing labor and equipment rental
- Excavation and transportation of overburden
- Management and construction of ore and waste rock piles
- Construction of site infrastructure to accommodate facilities
- Excavation and installation of underground pipes
- Snow removal and road and site maintenance
-
Mining
Mine Wabouchi, Travaux préparatoires du site
Description du projet
- Projet réalisé par NDC-Fournier
- Excavation et transport de déblai
- Forage et dynamitage
- Remblai
- Concassage d’agrégats
- Ponceaux et ouvrages connexes
- Membranes et géotextiles
- Bassin de captation
-
Mining,
Minier
Wabouchi mine, Site preparation work
Project description
- Excavation and transport of spoil
- Drilling and blasting
- Backfill
- Aggregate crushing
- Culverts and related structures
- Membranes and geotextiles
- Catch basin
-
Mining
Greenstone Gold Mine, Tailing management facility
Project description
- Development of structures from the dam to the perimeter
- Development of the « TMF » inner dam structures and infiltration water collection dikes
- Perimeter seepage Collection ditches and seepage collection pond
- Transfer spillway channel
- Temporary diversion channel and emergency spillway
- Development and extraction of « Till » from borrow pit area
- General and perimeter access Road
- Drainage crossing
-
Civil Engineering,
Mining
Fire Lake Mine, Stripping work
Project description
- Loading, transporting and piling of overburden – 3 700 000 m³
- Related works such as road maintenance, water management and stockpile maintenance
-
Mining
Greenstone GoldMine, Parc à résidus
Description du projet
- Aménagement des ouvrages du barrage au périmètre
- Aménagement des ouvrages du barrage intérieur «TMF» et digues de collecte des eaux d’infiltration
- Fossé de collecte des eaux d’infiltration du périmètre et bassin de collecte des eaux d’infiltration
- Canal du déversoir de transfert
- Canal de dérivation temporaire et déversoir de secours
- Développement et extraction du «Till» dans les bancs d’emprunt
- Route d’accès générale et au périmètre
- Traversée de drainage
-
Civil Engineering,
Mining
Hemlo Mine, Work on the tailings site
Project description
- Dykes, basins and surface water management at the mine
- Geotextile installation
- Transport and placement of rockfill
- Environmental basins
- Aggregate crushing
-
Mining,
Génie Civil
Mine Fire Lake, Travaux de décapage
Description du projet
- Chargement, transport et mise en pile de mort terrain – 3 700 000 m³
- Travaux connexes tels que l’entretien des chemins, la gestion de l’eau et l’entretien des haldes
-
Mining,
Génie Civil
Mine Hemlo, Travaux parc à résidus
Description du projet
- Travaux de digues, bassins et gestion des eaux de surface de la mine
- Pose de Géotextile
- Transport et mise en place d’enrochement
- Bassins environnementaux
- Concassage d’agrégats
-
Mining
Alamos Gold – Island Gold Mine, Civil engineering – Phase 3 expansion project
Project description
- Installation of underground services on the mine site and connections to existing underground services
-
Aggregates
Mine Renard, Production d’agrégats
Description du projet
- Concassage et tamisage de stérile dans le but d’en faire la revalorisation pour les besoins des opérations de la mine
- Abrasif pour entretien des chemins et rampes d’accès
- Matériaux granulaires pour le parc à résidus
-
Aggregates
Mine Renard, Aggregate production
Project description
- Crushing and screening of waste rock for reuse in mine operations
- Abrasive for path and ramp maintenance
- Granular materials for the tailings facility
-
Civil Engineering
Windfall project, Power line – Civil works
Project description
- Civil works for a 69 kV power line connecting Windfall Mine to Hydro-Québec’s Lebel substation
- Deforestation and land clearing
- Path construction
- Portal backfill
- Aggregate screening
-
Mining
Alamos Gold – Island Gold Mine, Travaux civils – projet d’expansion de la phase 3
Description du projet
- Installation de service enfouis sur le site de la mine et raccordements aux services enterrés existants
-
Génie Civil
Projet Windfall, Ligne Électrique – Travaux civils
Description du projet
- Travaux civils pour une ligne électrique de 69 kV reliant la mine Windfall au poste Lebel d’Hydro-Québec
- Déboisement et défrichage
- Construction de chemin
- Remblai de portique
- Tamisage d’agrégats
-
Génie Civil
Waskaganish, Nouvelle conduite de refoulement du poste Rupert
Description du projet
- Remplacement de la conduite de refoulement des eaux usées
- Fourniture et mise en place d’une conduite de refoulement de 250 mm de diamètre en PVC DR 18
- TerraBrute CR reliant le poste de pompage de Rupert aux bassins de traitement – 2 600 m.lin.
- Fourniture et installation de chambre de drainage
- Fourniture et installation de chambre purgeur d’air
-
Civil Engineering,
Génie Civil
Waskaganish, New Rupert substation force main
Project description
- Replacing the sewage pressure line
- Supply and installation of a 250 mm diameter PVC DR 18 discharge pipe
- TerraBrute CR connecting the Rupert pumping station to the treatment basins – 2 600 m.lin.
- Supply and installation of drainage chamber
- Supply and installation of air vent chamber
- Project carried out in partnership with a local company
-
Civil Engineering,
Génie Civil
Waskaganish, Construction of the storm sewer outlet
Project description
- Deforestation work, topsoil stripping
- Complete road infrastructure and related works
- Construction of the rain outlet with a diameter of 1 200 mm – 945 m.lin.
- Ditch excavation and profiling – 1 900 m.lin.
- Related work including construction of culverts and manholes
- Project carried out in partnership with a local company
-
Génie Civil
Waskaganish, Construction de l’exutoire de l’égout pluvial
Description du projet
- Travaux de déboisement, décapage de terre végétale
- Infrastructure complète de voirie et travaux connexes
- Construction de l’exutoire pluvial d’un diamètre de 1 200 mm – 945 m.lin.
- Excavation et profilage de fossé – 1 900 m.lin.
- Travaux connexes dont la construction de ponceaux et regards
-
Génie Civil
Waskaganish, Réfection des infrastructures civiles
Description du projet
- Rechargement de fondation de chaussée, isolation et reconstruction des rues
- Ajustement et déplacements de structures
- Pavage, bordures et trottoirs
- Terrassement
- 40 entrées de services
-
Civil Engineering,
Génie Civil
Waskaganish, Civil infrastructures rehabilitation
Project description
- Roadbed foundation reloading, insulation, and street reconstruction
- Adjustment and relocation of structures
- Paving, curbs, and sidewalks
- Landscaping and earthworks
- 40 service entrances
-
Civil Engineering,
Mining
Lamaque Mine – Triangle Worksite, Civil works
Project description
- Deforestation and excavation
- Earthworks and infrastructure for various buildings
- Construction work – Clean water line and sewer line
- Rehabilitation of the access road to the mine site
- Snow removal and maintenance of the site in winter
- Formwork and concrete placement
- Management of waste rock piles
-
Mining
Matawinie project, Land preparation
Project description
- Deforestation and stripping work
- Excavation, transportation and stockpiling of cuttings
- Drilling and blasting
- Mass earthmoving
- Development of access path and various infrastructure on site
- Shaping of a retention basin and ditch
-
Mining,
Génie Civil
Mine Lamaque – Site Triangle, Travaux civils
Description du projet
- Déboisement et excavation
- Terrassement et infrastructure pour divers bâtiments
- Travaux de construction – Conduite d’eau potable et d’égout
- Réfection du chemin d’accès au site de la mine
- Travaux de déneigement et entretien du site en période hivernale
- Travaux de coffrage et mise en place du béton
- Gestion des haldes à stériles
-
Mining
Projet Matawinie, Préparation de terrain
Description du projet
- Travaux de déboisement et décapage
- Excavation, transport et mise en pile des déblais
- Forage et dynamitage
- Terrassement de masse
- Aménagement chemin d’accès et divers infrastructure sur le site
- Mise en forme d’un bassin de rétention et fossé
-
Civil Engineering
Billy Diamond road, Replacement of complex culverts
Project description
- Complete demolition of the existing culvert battery
- Replacement of existing culverts for a new arched structure
- Replacement of existing culverts for a new concrete structure
- Earthworks, pavement foundation and miscellaneous works
- Maintenance of traffic during the work, including a temporary bridge
- Water management
-
Génie Civil
Route Billy Diamond, Remplacement de ponceaux complexes
Description du projet
- Démolition complète de la batterie de ponceaux existante
- Remplacement des ponceaux existants pour une nouvelle structure arquée
- Remplacement des ponceaux existants pour une nouvelle structure en béton
- Travaux de terrassement, fondation de chaussée et travaux divers
- Maintien de circulation durant les travaux, incluant un pont temporaire
- Gestion des eaux
-
Mining
Greenstone GoldMine, GoldField Creek diversion dyke
Project description
- Diversion dyke earthworks including the following works
- Diversion channel and temporary cofferdam
- GoldField Creek Permanent Diversion Channel
- Level 1 and 2 control structure
- Development and extraction of sand and gravel in borrow pits
- Various access roads
- Drainage crossings
-
Mining
Mont-Wright Mine, UTER-HS-2 water treatment plant
Project description
- Deforestation, grubbing, stripping and excavation work
- Development of ditches, shaping of protective embankments
- Backfilling and leveling work down to the finished ground
- Landscaping for factory and pumping stations
- Production, formwork and placement of concrete
- Process mechanics work
- Building mechanics for plumbing work
-
Mining
Greenstone GoldMine, Digue de dérivation GoldField Creek
Description du projet
- Travaux de terrassement de la digue de dérivation comprenant les travaux suivants
- Canal de dérivation et batardeau temporaire
- Canal de dérivation permanent du GoldField Creek
- Structure de contrôle du niveau 1 et 2
- Développement et extraction de sable et de gravier dans les bancs d’emprunt
- Divers routes d’accès
- Traversées de drainage
-
Civil Engineering
James Bay Road, Replacement of 22 culverts
Project description
- Replacement of 22 existing structures at 19 sites
- Supply and installation of 14 new culverts
- Repairs to 6 existing culverts
- Earthworks, pavement foundation and miscellaneous works
-
Mining
Mine Mont-Wright, Usine de traitement des eaux UTER-HS-2
Description du projet
- Travaux de déboisement, essouchement, décapage et excavation
- Aménagement des fossés, mise en forme de talus de protection
- Travaux de remblai et mise à niveau jusqu’au sol fini
- Aménagement extérieurs pour usine et les postes de pompage
- Production, coffrage et mise en place de béton
- Travaux de mécanique de procédé
- Mécanique de bâtiment pour travaux de plomberie
-
Mining
Matawinie project, Access road
Project description
- Stump removal and stripping – 25 ha
- Drilling and blasting
- Excavation and mass excavation
- Infrastructure works for the new access road to the future mining site
- Culverts and related structures – 36 units
- Crushing and aggregates – 170 000 mt
-
Génie Civil
Route de la Baie-James, Remplacement de 22 ponceaux
Description du projet
- Remplacer les 22 structures existantes sur 19 sites
- Fourniture et mise en place de 14 nouveaux ponceaux
- Réparations de 6 ponceaux existants
- Travaux de terrassement, fondation de chaussée et travaux divers
-
Mining
Odyssey Mine, Headframe excavation and hoist room
Project description
- Excavation and stripping of overburden – 142 000 m³
- Riprap on slopes with or without membranes – 25 000 m³
- Construction of access ramps and work areas – 10 000 m³
- Construction of access required for stripping work
- Surface water management
-
Mining
Projet Matawinie, Route d’accès
Description du projet
- Essouchage et décapage – 25 ha
- Forage et dynamitage
- Excavation et déblai de masse
- Travaux d’infrastructure pour la nouvelle route d’accès au futur site minier
- Ponceaux et ouvrages connexes – 36 unités
- Concassage et agrégats – 170 000 tm
-
Mining
Mine Odyssey, Excavation chevalement et salle des treuils
Description du projet
- Excavation et décapage du mort-terrain – 142 000 m³
- Enrochement des pentes avec ou sans membranes – 25 000 m³
- Construction des rampes d’accès et aires de travaux – 10 000 m³
- Construction des accès requis pour travaux de décapage
- Gestion des eaux de surfaces
-
Mining
Mont-Wright Mine, Offload project
Project description
- Loading and transportation – 800 000 m³
-
Mining
Côté Gold project, Plant site
Project description
- General site earthworks down to finished ground level to accommodate new facilities and buildings
- Excavating and transporting overburden stockpiling
- Excavation and transporting topsoil stockpiling
- Drilling, blasting and rock excavation
- Site runoff and stormwater management
- Erosion and sedimentation control
- Construction of the mine water basin
- Construction and management of stockpiling yards
- Construction of the main access road and service roads
- Construction of roads, culverts, structures and ditches on site
- Supply and guarantee of quality control of granular materials
- Supply, installation and infrastructure works for all site services
- Design, supply and installation of various pumping stations and related works
- Supply, installation and infrastructure works for clean water supply to the site
- Supply, installation and commissioning of 13.8 kV overhead distribution lines
-
Mining
Mine Mont-Wright, Projet Offload
Description du projet
- Chargement et transport – 800 000 m³
-
Mining
Projet Côté Gold, Plant site
Description du projet
- Travaux de terrassement du site général jusqu’au niveau du sol fini, en vue de l’accueil des nouvelles installations et nouveaux bâtiments
- Excavation et transport mise en pile du morts-terrain
- Excavation et transport mis en pile de la terre végétale
- Travaux de forage, dynamitage et excavation du rock
- Gestion des eaux de ruissellement et pluviales du site
- Contrôle de l’érosion et de la sédimentation
- Construction du bassin d’eau de la mine
- Construction et gestion des parcs de mise en pile
- Construction de la route d’accès principale et routes de services
- Construction des chemins, ponceaux, structures et fossés sur le site
- Fourniture et contrôle assurance qualité des matériaux granulaires
- Fourniture, installation et travaux d’infrastructure pour tous les services du site
- Conception fourniture et installation des diverses stations de pompages et travaux connexes
- Fourniture, installation et travaux d’infrastructure pour alimentation en potable du site
- Fourniture, installation et mise en service des lignes de distribution aériennes de 13,8 kV
-
Civil Engineering
Chisasibi path, Replacement of culverts
Project description
- Intervene on existing structures on the Baie-James road
- Complete replacement of existing structures – 20 units
- Earthworks, pavement foundation and miscellaneous works
- Water management and road signs
-
Génie Civil
Chemin de Chisasibi, Remplacement de ponceaux
Description du projet
- Intervenir sur des structures existantes de la route de la Baie-James
- Remplacement complet de structures existantes – 20 unités
- Travaux de terrassement, fondation de chaussée et travaux divers
- Gestion des eaux et de la signalisation routière
-
Civil Engineering
Waskaganish, Industrial park
Project description
- Addition of sewer networks (storm, sanitary) and an aqueduct section in this sector of the community
-
Génie Civil
Waskaganish, Parc industriel
Description du projet
- L’ajout des réseaux d’égouts (pluvial, sanitaire) et d’une section d’aqueduc dans ce secteur de la communauté
- Projet en partenariat avec une entreprise locale
-
Mining
Mont-Wright Mine, North Dyke
Project description
- Construction of the North Dike
- Deforestation – 4 ha
- Stripping, cleaning and treatment of rock – 80 000 m³
- Backfilling and riprap – 250 000 m³
- Membrane laying
- Extension of the internal ditch – 6 km
- Excavation and transportation of overburden – 200 000 m³
- Backfill for profiling and shaping – 7 000 m³
- Installation of culverts
- Path construction
-
Mining
Mine Mont-Wright, Digue Nord
Description du projet
- Construction de la Digue Nord
- Déboisement – 4 ha
- Décapage, nettoyage et traitement de roc – 80 000 m³
- Remblayage et enrochement – 250 000 m³
- Pose de membrane
- Prolongement du fossé interne – 6 km
- Excavation et transport de mort terrain – 200 000 m³
- Remblai pour profil et mise en forme – 7 000 m³
- Installation de ponceaux
- Construction de chemin d’accès
-
Mining
Mine Mont-Wright, Bassin C
Description du projet
- Aménagement d’un nouveau réseau de gestion des eaux de ruissellement de la mine
- Déboisement et excavation du mort terrain – 250 000 m³
- Excavation au roc incluant : forage, dynamitage, excavation, transport – 30 000 m³
- Construction de digues – 50 000 m³
- PEBDL Géomembrane – 80 000 m³
- Géodrain – 50 000 m³
- Géotextile – 50 000 m³
- Concassage et tamisage d’agrégats – 100 000 m³
-
Mining
Mont-Wright Mine, Basin C
Project description
- Development of a new mining runoff management network
- Deforestation and excavation of overburden – 250 000 m³
- Rock excavation including: drilling, blasting, excavation, transport – 30 000 m³
- Construction of dykes – 50 000 m³
- LLDPE Geomembrane – 80 000 m³
- Geodrain – 50 000 m³
- Geotextile – 50 000 m³
- Crushing and screening of aggregates – 100 000 m³
-
Mining
Barnat Mine, Stripping and backfilling
Project description
- Excavation, loading and transporting of material – 12 000 000 m³
- Loading, transporting and piling of rock fill – 1 000 000 m³
- Temporary noise barrier – 900 m²
- Construction of a storage area with a superficy of 3 275 m² – 2 000 mt
- Road maintenance service
- Operation of remote-controlled equipment for high-risk work (PC1250 excavator and D8 tractor)
- Sound and dust management in a controlled environment
-
Mining
Mine Barnat, Décapage et remblai
Description du projet
- Excavation, chargement et transport de matériel – 12 000 000 m³
- Chargement, transport et mise en pile remblai rocheux – 1 000 000 m³
- Écran temporaire anti-bruit – 900 m²
- Construction d’une aire d’entreposage d’une superficie de 3 275 m² – 2 000 tm
- Service d’entretien des chemins
- Opération d’équipements téléguidés pour travaux à risque (Pelle PC1250 et tracteur D8)
- Gestion du son et des poussières dans un environnement contrôlé
-
Mining,
Génie Civil
Complexe minier Lamaque – Site Sigma, Travaux civils
Description du projet
- Terrassement et infrastructure pour divers bâtiments
- Conduite d’eau potable et d’égout
- Travaux de déneigement et entretien du site en période hivernale
- Coffrage et mise en place du béton pour les divers bâtiment de service
- Travaux d’étanchéisation et de rénovation de 3 stations de pompage
- Ligne de résidus cyanuré
-
Civil Engineering,
Mining
Lamaque mine complex – Sigma Worksite, Civil works
Project description
- Earthworks and infrastructure for various buildings
- Clean water line and sewer line
- Snow removal and maintenance of the site in winter
- Formwork and placement of concrete for the various service buildings
- Sealing and renovation works of 3 pumping stations
- Cyanide tailings line
-
Mining
Gouldie Mine, Mining operation
Project description
- Operation of an open pit in a « turnkey » formula
- Excavation, loading and transportation of ore and waste rock – 30 000 000 mt
-
Mining
Mine Gouldie, Opération minière
Description du projet
- Opération d’une fosse à ciel ouvert en formule « clé en main »
- Excavation, chargement et transport de minerai et stérile – 30 000 000 tm